BP MIGAS
Tangguh LNG Project, approved in Q1-2005, is one of the most complex projects in BP's portfolio and is one of the 5 major New Profit Centres in BP's growth strategy. The development involves tapping offshore gas fields, with proven resources of 14.4 tcf, and producing liquefied natural gas (LNG) in the Bintuni Bay area of the province of Papua (formerly called Irian Jaya).
The Tangguh LNG Facilities will comprise two offshore production platforms linked by two sub-sea pipelines to an onshore LNG Facility which is being constructed on a greenfield site on the south shore of Bintuni Bay in Papua. This location provides good sea access, stable soils and ample area for future expansion. The LNG plant will be a complete grassroots development including all ancillary facilities required to be self-supporting. Two liquefaction trains will be constructed initially, with each train having LNG production capacity of 3.8 mtpa. Storage and loading facilities will be provided for export of LNG and gas condensate products by marine tankers. Utility systems providing electricity, steam, water, and other plant needs will be constructed to meet daily plant requirements.
To support our operation, we invite all suitably qualified professionals to come, join and grow with us as:
1. LNG Marine Superintendent Assistant
(Jakarta Raya)
Responsibilities:
Understudy all aspects of the LNG Marine Superintendents position
Assisting in development of SO&ST operating policy and procedures
Monitor operating standards on board to Charterers requirements
Monitor vessel performance including customer feedback, SIRE, PSC findings and optimization
Assist with investigating any incidents/near misses/trends
Keep abreast of changes to legislation, developments in technology and industry best practice
Assist/undertake compatibility studies
Assist with the preparation for all Nautical service contracts
Assist with maintaining Shipyard supervision, visits and inspections on a regular basis
Assist sales operations team with scheduling as required
Assist with chartering in and out LNG vessels
Requirements:
Minimum 5 years shipping experience, including recent operational tanker experience in a senior capacity as a Deck Officer (LNG preferred)
Familiarity with Safety Management Systems and industry best practice
Minimum Deck Officer Class 2 Certificate of Competency or degree in marine related discipline
Experience of working with different cultures
Previous shore experience in similar role advantageous
Computer literate
Fluent in oral and written English
2. Senior Process Engineer
(Papua)
Responsibilities:
Reporting to the Site Engineering Manager, you will be responsible for providing advice on process engineering related activities. You will be held accountable to ensure safe installation and operation of offshore gas production platforms, pipelines, onshore LNG production, and storage and loading facilities.
Requirements:
Bachelor degree in Chemical/Petroleum Engineering;
Minimum 15 years of relevant experience with at least 10 years experience in technical/engineering or operation of LNG plants and/or similar processing plant;
Proven mastery skill in the process engineering area;
Have an extensive discipline networks with the communities; Strong knowledge of gas conditioning & processing technology, heat transfer technology, process safety in design, refrigeration and cryogenic liquefaction technology, water technology, steam generation system and fired heater technology;
A good command of both oral and written English;
Strong leadership skills.
Please go to: www.bp.com/careers/indonesia , go to “view jobs” and click on the job you wish to apply to submit your interest.
Applications deadline: January 31, 2008.
Please note that only short-listed candidates will be contacted.
14 January 2008
Lowongan BP MIgas : liquefied natural gas (LNG) Company
Label: ENGINEER